SOC 47-2152Markdown ↗
Structurally ResilientRegulatory Friction: high · Model DAI-2026.4
Plumbers, Pipefitters & Steamfitters
High physical dexterity in non-standardized buildings places plumbing firmly inside the ~30% zero-exposure labor floor.
Observed Exp.
4%
Theoretical
10%
Automation
8%
Jr. Squeeze
4/100
2030 Est.
+10%
U.S. Scale
482k
$62k med.
Observed vs. Theoretical Gap6 pp wedge
Real-world enterprise workflows delegate 4% of tasks today versus 10% theoretical LLM capability.
Delegation Mode Split8% Auto · 92% Aug
Skewed toward interactive human-in-the-loop co-piloting where judgment and accountability retain leverage.
1. Task-Level Breakdown
01 · Automating Now
- —Dispatch routing, customer quote generation, and invoice collection
- —Municipal code lookup and parts catalog cross-referencing
- —Service call summary logging
02 · Shifting to Co-Pilot
- —Acoustic leak detection telemetry and pipe-camera defect tagging
- —Preventative maintenance scheduling for commercial buildings
03 · Durable Human Moats
- —Dexterous physical repair in cramped, wet, non-standard crawlspaces
- —Emergency diagnostics under unpredictable structural conditions
2. Career-Stage Risk Divergence
How modeled displacement pressure and augmentation leverage shift inside SOC 47-2152 across seniority and AI fluency.
Entry-Level (0–2y)
Structurally Insulated
Pressure
5/100
Augment Lift
8/100
Mid-Career Baseline
Structurally Insulated
Pressure
4/100
Augment Lift
8/100
Senior / AI-Fluent
Structurally Insulated
Pressure
4/100
Augment Lift
8/100
3. Modeled 2025–2030 Task Allocation (Mid-Career Baseline)
| Year | Automated % | AI-Augmented % | Human Core % |
|---|---|---|---|
| 2025 | 2% | 6% | 92% |
| 2026 | 2% | 6% | 92% |
| 2027 | 3% | 6% | 91% |
| 2028 | 3% | 6% | 91% |
| 2029 | 4% | 5% | 91% |
| 2030 | 4% | 5% | 91% |
Personalize SOC 47-2152
Adjust task sliders, org size, and AI fluency for your exact seat.
Related Occupations in Skilled Trades & Field Ops